Did you know?
* The Hall contains 12,500 pieces of primary steel, which weigh over 11,000 tons
* A 750 pound crane was needed to erect the steel support structure
* 300 tons of bolts and welds were used
* 18,000 cubic yards of concrete were poured, including two roof slabs 15 inches thick